July 31, 2015

BACA's Summer Fiesta 2015

BACA’s 2015 summer party, a pop-up fiesta, will be taking place at Beadnell Mews prior to demolition. The courtyard and small warehouses will make way for a new mews development.

Expect music, summer catering and a drink or two to celebrate the summer and another successful year.

For more information, please contact Amy Dron on adron@baca.uk.com.  We hope to see you there..!

About Beadnell Mews

Once completed, the development will comprise a three-/four-storey residential block along the street front, with four houses facing onto a shared courtyard to the rear. The front block is divided in two to provide a pedestrian routeway through to the new mews at the rear. Each house has its own garden that opens onto the central courtyard – a communal safe playground for children and a shared place for all the residents. The buildings have been sculpted to maximise light between and over the houses into the courtyard, as well as creating south-facing roofs for solar panels. The front block is designed to create a contemporary form that also provides continuity along the street line, with the roof of the front block crafted to reduce the eaves line.

March 3, 2026

Foresight and Memory in Resilience

February 18, 2026

New in The Guardian: ‘One in nine new homes “built in areas of flood risk”’

February 4, 2026

Attending WATER: Resilience & Innovation for the Built Environment

January 22, 2026

W-Roads

January 15, 2026

The Future of Resilient Waterfront Development and Floating Infrastructure

December 18, 2025

The Circular Waterfront Economy