January 13, 2023

Weave House

After the long lag caused by the COVID pandemic, we are pleased to report a wave on new flood resilient homes will start in site this year that will test new technologies and with innovation at the threshold of current policy parameters.

Weave House has secured full planning permission in Chelmsford. A suburban infill site next to a river the site has provided both a challenge in terms of tackling traditional infill policy with the complexity of flooding.

The 285m² (3000sq ft) 'part flood-resilient, part-elevated' Weave House will replace an existing, rundown house and outbuildings. The project, which is expected to cost around £900,000, features two blocks connected by a ramped spine. The landscaping will re-wild several areas of the garden by removing much of the existing hard standing.

Featured on AJ​: https://www.architectsjournal.co.uk/news/baca-wins-approval-for-flood-resilient-house-in-chelmsford

February 4, 2026

Attending WATER: Resilience & Innovation for the Built Environment

January 22, 2026

W-Roads

January 15, 2026

The Future of Resilient Waterfront Development and Floating Infrastructure

December 18, 2025

The Circular Waterfront Economy

December 11, 2025

Living With Water, Not Against It

November 30, 2025

BACA architects unveil 'Floating Fanzone' for Hill Dickinson Stadium