August 5, 2016

Integrated Masterplan for Littlehampton

In collaboration with GL Hearn, BACA were asked to investigate the potential for the future expansion opportunities to support the growth of the West Sussex town of Littlehampton.

BACA carried out initial feasibility studies on over 30 sites to determine the most suitable opportunities. From the 30 sites 8 sites were considered potentially suitable to deliver the 1000 home strategic objective of the Littlehampton Economic Growth Area. Following identification of suitable sites a coordinated and integrated strategy was implemented to create sustainable development and infrastructure able to support the economic growth targets.

Due to the potential for flooding in and around Littlehampton BACA architects strategic specialism in flood mitigation solutions to create safe new development was drawn on to provide a coherent and feasible framework for future development.

The new development will not be fully defended and Makes Space for Water by retaining effective flood plain across the site where suitable. The proposals include flood resilient homes, flats over car parking that will be allowed to flood in extreme flood events and elevated mixed-use schemes.

February 4, 2026

Attending WATER: Resilience & Innovation for the Built Environment

January 22, 2026

W-Roads

January 15, 2026

The Future of Resilient Waterfront Development and Floating Infrastructure

December 18, 2025

The Circular Waterfront Economy

December 11, 2025

Living With Water, Not Against It

November 30, 2025

BACA architects unveil 'Floating Fanzone' for Hill Dickinson Stadium