
+44 (0)207 939 0985
mail@baca.uk.com



| Client | Private |
| Status | On-going |
Baca has prepared plans for floating bus stops. The pontoons will be constructed from prefabricated parts, including plug-in components such as benches and bicycle stands. A canopy with integral lighting will provide shelter, signage and illumination.