
+44 (0)207 939 0985
mail@baca.uk.com



| Client | Defra Funding |
| Status | Concept plan |
| Team | BRE, Halcrow, Fulcrum Consulting, Cyril Sweett, LDA Design |
By looking at a number of sites simultaneously it was possible to prioritise the use of sites at lowest risk of flooding first. Flood-risk measures on the upstream sites could be used to reduce flood risk to sites down stream.