
+44 (0)207 939 0985
mail@baca.uk.com



| Type | In-house research |
| Status | Ongoing |
During very high tides the concrete blocks would become buoyant. The blocks would be carried in to dock by the incoming tide to block the highest water levels. Water would be pumped out of chambers in the block to refloat them out into the river and allow boats to pass.